Details make the difference. Commitment takes us further.
Chot water urn|NAB6 40L・NAB2 120L commercialhot water urn
Ni-Kovic electro-heat-hot water urn uses electricity heating to store heat water, which can provide a continuous supply of heat water for batteries, bed coffee, beverages and cooking houses, and is the core commercial heat equipment for Hong Kong-style cafe, Hong Kong-style cafe water.
- NAB6 10 gallons (40L) ・ 3KW・ 220V
- NAB2 30 gallons (120L) 1515KW・380V
- NAB6 size 407 × 250 × 715mm (H)
- NAB2 size 560 × 380 × 1125mm (H)
Electrhot water urn specifications
The following is information on the standard type of Ni-Kovic electric heat-hot water urn, with other dimensions, and is available on the basis of your hot water usage.
| Item | NAB6 | NAB2 |
|---|---|---|
| Capacity | 10 Plus (40L) | 30 Plus (120L) |
| Size | 407(W) × 250(D) × 715(H) mm | 560(W) × 380(D) × 1125(H) mm |
| Electrical pressure | 220V | 380V |
| Rental power | 3KW | 15KW |
| Type of product | Electric Cooking Equipment (electronic heathot water urn) | |
| Other dimensions | Other sizes are available and enquiries are welcome | |
NAB6 NAB2? commercialhot water urn point option
Hot water urn was selected for three main species: thermal water use in the busy hours, the heating rate, and the lithium power.
NAB6|10 gallon (40L) 33KW・ 220V
- Accumulative, depth of 250 mm can be placed on or by the wall on the dam.
- 220V Electricity is provided separately and does not make it possible to make it possible to make it easier to schedule.
- Fixed Hong Kong-style cafe, Hong Kong-style cafe, coffee shops, small restaurants, or auxiliary hot water.
- 3KW Thermal velocity is slow and is suitable for the smooth use of heat water.
NAB2|30 gallery (120L) 1515KW・380V
- The capacity is three times that of NAB6, and is cumbersome and cumbersome infrequent water.
- Power 15KW, five times that of NAB6, was used to complete a round of renewable heat water more quickly.
- Hong Kong-style cafe, bar buildings, canteens and central bathrooms suitable for meals.
- 380V is required for electricity and adequate landing (high 1125 mm).
| Situation | Direction of recommendation |
|---|---|
| Breaks, water platings, only single-size electricity | NAB6 |
| Breakfast meals with the lunch city ' s peak | NAB2 |
| Larger water urn has been used for backup or sub-division | Add 1 NAB6 |
| Special cooperation in capacity or size | Search for other dimensions |
hot water urn is patienced by a frozen water pump?
Our water use is computed in theory (approximately 4.186 kJ/kg °C), assuming that water is hot to 100 °C by 20 °C, and that there is no heat loss or depletion:
| Type | Water quantity | Energy requirements (theory) | Power | Shortest heating time (theory) |
|---|---|---|---|---|
| NAB6 | 40L | Approximately 3.7 kWh | 3KW | Approximately 75 minutes |
| NAB2 | 120L | Approximately 11.2 kWh | 15KW | Approximately 45 minutes |
It can be seen from calculations that NAB2 has a capacity of three times, but has a high of five times, so that it begins with frozen water and is more likely than NAB6 to become dams, and if water is high in time of cumbersome, the model of high power is more stable.
hot water urn electrical arrangements: 220V with 380V
NAB6 | 3KW 220V
I ≈ 3,000W ÷ 220V ≈ 13.6A
Flows were slightly higher than Hong Kong ' s general 13A insertion thresholds, so it was not recommended that an independent circuit should be arranged when the general appliances were inserted in 13A plugs, which were less dragged.
NAB2 | 15KW 380V
I ≈ 15,000W ÷ (√3 × 380V) ≈ 22.8A (each)
A three-size electricity, power factor 1 is roughly calculated and is part of a large-power facility to confirm that the lithium is supplied with 380V and that the total load is sufficient.
- The above fluxes are only rough estimates, with the specifications of switches, cable diameters and appliances, which are based on the equipment motto and are calculated by registered appliances.
- Total power of buried baby equipment, e.g. Three-Door Electric Steam Cabinet, Induction Combination Ranges, electric fryer et al.
- In Hong Kong, the fixed power plant works are carried out by registered electric operators with registered electric engineers.
Electrical heathot water urn commercial use
Portal, coffee, cadmium
Hong Kong-style cafe dam collapsing, large heat water is required for bambard coffee, in collaboration with Hot water urn Electricitytea and coffee urn It consists of a complete water pump.
柠茶, hot beverages, veils
Heat beverages such as hot shoes, copper, Awada, good grams, and heat veils and the legs of the first drings, all rely on stable hot water.
Daily hot water for kitchens
Rapidly replenishing the coatings of the cooking water, reducing the use of cooking water and leaching Commercial Induction Cookers Place of work.
Water for the bar building
The dam of the bar building and the building will provide long-term supplies of heat batteries, and the bathroom kitchen equipment will be equipped with sufficient hot water capacity.
Cafeteria, offices, premises
The cafeteria and the water pumps of large agencies have a high volume and concentration that can be considered for NAB2s with large capacity.
Hotels, stores
Substantial, sugar, heating, and the availability of hot water at any time, are required.
Hong Kong-style cafe dam equipment planning
Hong Kong-style cafe is one of the most intensive locations of the Hong Kong-style cafe bill. Hot water urn, tea and coffee urn, refrigerator rankings along the job spots directly affect the speed of the drinks.
| Water dam equipment | Application |
|---|---|
| Electric Hot Water Urns | Sustained supply of heat water |
| Electricitytea and coffee urn | Portal, café and temperature |
| Commercial Refrigeration, stainless steelrefrigerator枱 | Dinking, copper, frozen refrigeration materials |
| Stainless Steel Worktables | Establishment of equipment, provision |
| stainless steel star, laundry | Laundry, laundry bag |
| stainless steel layer, copper | Storage with dry cargo |
Planning elements
- hot water urn is close to tea and coffee urn, reducing the distance from the hot water.
- Water outflows are linked to water locations to avoid surface water.
- hot water urn ' s water gate is easy to operate while avoiding human streams and preventing burns.
- Power sources are separated from water pumps.
- Dams, refrigerator coatings can be constructed by Ni-Kovic ' s feet of stainless steelkitchen equipment, which is consistent with the size of the water.
Full roof movable lines can be consulted A Complete Guide to Restaurant Kitchen Planning in Hong Kong.
hot water urn installation point
- Confirmation of location : NAB6 provides for 407 面 250 mm masks, 715 mm high; NAB2 reserves 560 560 380 mm landing status, 1125 mm high, and reserved operational and maintenance space.
- Confirmation of electricity : NAB6 In the case of 220V, NAB2, 380V, independent circuits are arranged by registered electric engineering personnel.
- Water access arrangements : If water supply is to be receptive, the relevant dam works should be carried out by licensed water pumps, and consideration may be given to the reduction of impurity by packing water.
- Dehydration arrangements : Preservation of drainage sites to facilitate later cleaning of cools.
- Initial use : Pre-lease confirm that the inner was watered and burnt; first rinsing washed with the first use of the pre-emptive water.
hot water urn diminut and maintenance
Would the point be repudiated?
Water-injected minerals are gathered in long-term heat plating cooks and form water pumps, which are insulated by heat efficiency declines, water times and influence the heat tunnel lifespan.
Commercial lithium equipment such as Electric Steam Cabinets, Electrical hot cables There are similar problems.
Daily maintenance list
- Frequently discharged water purifications, as well as plutonium.
- The use of food-grade dioling methods is followed by a complete bathing of the bath.
- Maintaining water levels and opening up without water.
- Typically dry purification machines are copied with water lobsters to maintain sanitation.
- Frequent check-ups of cables, temperature control and safety devices; leakage of water, leakage or abnormally immediate shutdown machines; and referral to professional examinations.
Selection of Ni-Kovic commercialkitchen equipment?
On-Time Delivery
Pre-delivery is our most basic and most important commitment to clients.
Our Own Factory in Mainland China
Trade has been integrated since 2013 and is managed directly by R & D and the Kitchen equipment plant.
Made to Measure
Water pumps, refrigerator platingstainless steelkitchen equipment, etc., can be constructed on foot.
Complete Kitchen Project
The same team is responsible for planning, ordering, installing and selling.
As Hong Kong-style cafe, Hong Kong Kong-style cafe, Hong Kong-style cafe, and the bar building, we provide one-stop commercial building works. Our Services, Projects, Our Clients and Five Ways Flameless Kitchens Can Reduce Costs.
Related commercial heat equipment
Electric Tea and Coffee Urn Range
Port pits, coffee water pumps
View Specifications
Electric Fryer Range
MCN1 single blows, 3KW 220V seating formula
View Specifications
Electric Griddle Range
Sung Kong-style cafe breakfasts, copper, veterinary, Hong Kong-style
View Specifications
Chicken Poacher
White chicken, palm oil, burnt
View Specifications
Electrhot water urn ' s common problem
The electro-heathot water urn has a protein?
Ni-Kovic electro-heathot water urn has NAB6 10 gallons (40L), dimensions 407 250250 mm 715 mm (H), 220V, 3KW; and NAB2 30 gallons (120L), size 560 3380 111125 mm (H), 380V, 15KW. Enquiries.
hot water urn is patienced by a frozen water pump?
In theory, water is heating from 20°C to 100°C: 40L is about 3.7kWh, with 3KW plus a minimum of 75 minutes; 120L is about 11.2 kWh, with 15KW plus a minimum of 45 minutes. The actual time will be longer due to heat and water temperature use.
NAB6 variant NAB2?
NAB6 40L, 220V, 3KW, sizeable, suitable for bathymetric Hong Kong-style cafe, Hong Kong-style cafe or auxiliary dams; NAB2 120L, 380V, 15KW, with high volumes of capacity, plating heat, Hong Kong-style cafe, bar building cooking cafe, etc.
hot water urn needs iodine power?
NAB6 3KW, 220V, with a total electrical flow of approximately 13.6A, slightly higher than the general 13A spot value; NAB2 15KW, 380V, with a three-sizer of approximately 22.8A. Both paragraphs recommend that independent circuits be arranged by registered electric engineers.
hot water urn points are watershed?
Long-term piped water pipes are sown with cooking water, affecting heat efficiency, and should be cleaned up with shrimps on a regular basis, using food-grade dioling methods, and completely looted for reuse after bathing.
Would hot water urn receptacle note?
If het water urn is to receptive water supply, the relevant dams should be carried out by license plates and can be considered for packing of water appliances to reduce impurities.
Would you choose to be suitable for your water urn?
We know that your drink bill, water calves and lithium power, and Ni-Kovic will propose for you the appropriate hot water urn hydraulic equipment programme.
WhatsApp 85293131881 Call 2155 2826