Details make the difference. Commitment takes us further.
Planning of the cafeteria in Hong Kong: one-stop shop for equipment to be designed by the layout
Hong Kong, which is rented, spaced and spawned as a wrong step in the planning of the kitchens, is likely to be demolished, badly licensed and pedestrian day, which is codified by Ni-Kovic and is subdivided by an opt-in, brake, refrigerator, stainless steelkitchen equipment and a one-stop shop.
WhatsApp Planning for Pre-App Understanding one-stop kitchen worksPrinciple of planning kitchens 6
- Advance of signatures - Rental titling, non-build, area, electricity, gas, drainage and drainage.
- Compliance with licensing requirements : Wheel, ground, hand-washing, ventilation and disinfection are required by ISA.
- One-way line Storage of copper copper copper copper lithium lithium plating, uncritical.
- Selection of equipment based on vegetables : Socie, cooling and refrigeration.
- Synchronization of infrastructure : Electricity, gas, ventilation, incomputation of oil with equipment.
- Made to Measure : stainless steelkitchen equipment is fitted with the height.
I. Selection assessment: 8 samples to be visited before signing
1. Leasing and planning purposes
The private building is required to meet the Government ' s lease conditions and the application is subject to a relevant statement; the use is not suitable and the refurbishment is not required.
2. Infractions of construction work
The Agency requested that the food industry be certified as not in breach of construction and that it be checked before taking over.
3. Area
The total size of the kitchens, food distribution rooms and laundry rooms shall not be less than the schedule set out in the Food Industry Code and shall be counted according to the surface area of the general building.
4. Electricity
There are no 380V terrain, the capacity available is much greater, and it is decided that it will not be possible to use large-power heat equipment.
5. Gas
There is no gas supply; the use of oil gas in the lower floor of the ground is subject to restrictions.
6. Emissions exports
Oil smoking points and export positions will not breed people and affect EPA ' s consent.
7. Water and sand wells
The proposed kitchens, food-supply rooms and laundry rooms should not contain sand wells; the location of the water and sewerage pools should be confirmed.
8. Base structure
At the bottom of the building, it is highly affected by the emplacement of pyrotechnics, wind and homogeneous equipment; the load of the building affects large equipment.
II. Breaking regulations for roofing and cooking houses
The cafeteria that runs canteens are subject to the application of a flat-winning licence (application FEHB 94). General roofs permit the distribution and sale of food to customers in the cafeteria by any mode of transfer. The following are the most relevant breeding provisions of the bathroom design, which are detailed on the basis of the latest IGAD guidelines.
| Item | UNCED request (summary) |
|---|---|
| Wall wall | The wall spacing surfaces of the kitchen and food floor walls are paved to no less than 2 m high with light, water incongestion, patience with simplicity (e.g. photocopying or stainless steel); and the wall foot-to-ground connections are to be inner shaped |
| Ground | Degradation, colour, water-free, easy-to-resistant materials, dumping at drainage canals |
| Astronomies | Harmable cleaning; kitchens should be avoided |
| Laundry | At least one place for each food room, kitchen and laundry at a standard of 20 employees; no less than 350 mm in length; and no less than 20 baths per continuum for intermittent water supply |
| Sharing | The proposed kitchens, food distribution rooms and laundry rooms should not contain sand wells |
| ventilation | Separate ventilation systems are installed in kitchens, toilets and seat rooms; metallic pyrotechnic fluorescent fluorescent fluorescent fluorescent fluorescent fluorescent fluorescent fluorescent platings are installed on the upper side of the furnace |
| Digestion | For example, the capacity is not less than 23 litres of disinfection, or the laundry machines approved by the Catering Authority |
| People | A full-time staff member to oversee the business of the Bible Cyclone Training Course is required. |
Suspensive licence
The Agency issues a provisional licence for a period of six months to a place that has met the basic requirements of the safety and security of the building and firefighting; if all basic licence plates have been met, they may be collected within one working day.
Cross-sectoral requirements
- Fire Service Fire certificate is one of the prerequisites for issuing a licence.
- Electrical Engineering Service : The gas planting works are performed by the registered gas engineering contractor, at least every 12 months of security inspection.
- Environmental Protection Agency : Specified gas shall not have visible oil smoke or cause gas disturbance.
- Office of the Board of Directors : Building security is in violation of construction.
iii. Dwelling wards: each district does it?
3.1 Receipt and storage areas
In the nearby door, chillery, frozen refrigeratorator mounted with the dry racks, as detailed. Restaurant Refrigeration Layouts.
3.2 Crude processing zones
Laundry, unfrozen, shark, meat treatment, fitstainless steel stars, washing and cooking work, and nickel refrigerator was near.
3.3 Deployed areas
The stainless steel work was platoon with refrigeratorator, with a well-established division of labour.
3.4 Connectivity area
Smoking is simplified by chicken, plumbing, blowing, emplacement.
3.5 Skitches/points
Three steam cabinets, dim sum steamer, rice roll steamer, deal with a large amount of gas with water.
3.6 Catering area
Leafing, maintenance equipment, refrigerator, close to feeding, separate from biological material.
3.7 Laundry area
Recycle, laundry, disinfection (e.g., laundry or disinfection), dry cooking, with a line separate from feeding.
3.8 Water pumps
tea and coffee urn,hot water urn, beverages refrigerator co-made ice, with easy access to the nearby building.
3.9 Staff area
Launded handcuffs, more dressed consellants, and staff were hand-washing before the bathing.
IV. Single-way trajectory design
- Receipts : The refrigeration is checked, i.e., refrigeration.
- Storage : Breaking, cooking, refrigeration, drying.
- Crude processing : Laundry, unfrozen, initial treatment.
- ATTENDANCE Distribution by level of work.
- Connectivity 炒, 蒸, 炸, blow, Tong, 扒.
- Feeding : Captains, chests, products.
- Recovery of laundry Removal of the bathing area by another route.
Modular design points
- Accompaniment of cross-cutting food and clean-up areas
- The shorter the distance between the workplace, the better the pedestrian, the better the leg.
- The main route is complete and easy to train
- No impact on different positions at peak times
- Client cooling is based on a second paragraph cooling method: within 2 hours 60°C 20 20°C, 4 hours 20°C 4 4°C
refrigerator is synonymous with refrigerator and can be visited Restaurant Refrigeration Layouts.
V. Fixed kitchen style
| Bureaux | Special characteristics | Applicable |
|---|---|---|
| Type I | Equipment platoon along a wall, with simple savings | Long sticks, fines, offshops |
| Double platoon (coordinary) model | Compared with two-way equipment, intermediation of puppets | Hong Kong-style cafe, mid-cafe |
| Type L | The two walls are corners and are prepared in isolation. | Licorne, open kitchens |
| U | Three sets of equipment, with a focus of work | Single mainstay, special place of work |
| Island type | Rolling equipment is centralized and rolled over four weeks | Large buildings, hotels, central kitchens |
| Sectoral | Independent subdivisions, by copper, chicken, chicken, burn, etc. | Brewery, large-scale vegetables |
Whatever the emplacement, it is necessary to cooperate with a single line of movement, a pyrotechnic location and water.
VI. Plutonium plating equipment: electro-gas? point appliances?
6.1 Electrical gas
Most of the commercial, treasury or no gas supply poles consider total electricity; the medium palm can be retrieved or configured with a fast firewok hei sale point. Cable information refers to a large analysis of the bar building ' s electrical appliances and about the energy efficiency of the cable.
6.2 Choice selection by grade of work
| Place of work | Recommended equipment |
|---|---|
| Medium-size-fits-all | Induction Wok Cooker with Rear Stock Pot (15/18/25KW) |
| Ton | Low-Level Induction Stock Pot Cooker (12/15/18KW) |
| Facebooks, spectacles | Four-Zone Freestanding Induction Range |
| Accompaniment, temperature | Countertop Induction Cookers (3.5KW) |
| Limited space | Combination Ranges |
| blows, burns, burning | Fryer, Griddle, Barbecue Grills |
| Flammation | Chicken Poacher |
| Water pump | Tea and Coffee Urn, Hot Water Urn |
Extended reading: How commercial induction cooker power is selected | induction wok cooker energywok tosing | Home vs commercial induction cooker | How Induction Works | Complete list of commercial heat equipment
VII. Plutonium equipment: cooking, shark, hot, powder
Three-Door Electric Steam Cabinet
SC-27K/36K, 800 × 850 × 1850(H) mm
View Specifications
Electric Dim Sum Steamer
SE-27K/36K, 800 × 850 × 820(H) mm
View Specifications
Electric Rice Roll Steamer
SR-27K/36K, single head/bond
View Specifications
The three paragraphs are 27KW/36KW, 380V terrain, and the lithium is reserved for water, water, ventilation and open space. A Buyer's Guide to Commercial Electric Steam Cabinets | Complete Guide to Commercial Electric Steam Pots | Electric Rice Roll Steamers vs Traditional Steamers
VIII. Refrigeration of refrigerator point
- Inventory : Customary refrigeration with refrigeration, near-take point.
- Place of work refrigerated counter (stainless steelrefrigerator 枱) is hanging, hanging and fitting.
- Floor : Chen, refrigeratorator.
- Rate Food Safety Centre recommends refrigeration at 4°C or below, refrigeration −18°C or below.
- Position : Distance from thermal sources and provision for dispersal heat with water.
Extended reading: Commercial refrigerator round-the-clock guide: wind chiller vs | Restaurant Refrigeration Layouts
Ni-Koviccommercial refrigerator
The refrigeration series is co-cooled with refrigerated counter needs.
IX. Stainless steelkitchen equipment for bathing facilities
9.1 Common kitchen steels
| Item | Application |
|---|---|
| Stainless Steel Worktables / No backbone | Availability, feeding, seating |
| stainless steel star, laundry | Laundry, unfrozen, laundry |
| Stainless Steel Shelving | Dry, appliance storage |
| stainless steel 柜, 碗柜 | Rests, meals |
| Stainless Steel Refrigerated Counters | Face work, chest refrigeration |
| Stainless Steel Trolleys | Delivery of staples, cage, cadmium |
| Stainless Steel Extraction Hoods | Oil cigarette collection, receptacle |
| Stainless Steel Grease Traps | Reducing grease entering the drainage system |
9.2 Signing?
- Hong Kong chrome, water and floors vary, with steel appliances now multiplied.
- The appliances, refrigeratorator, are in line with the high level of work and reduce sluggage.
- 304 stainless steel resistant to corrosion, surface sliding is easy to clean and is commonly used in commercial kitchens.
- IRS requires that the walls of the kitchen be paved to no less than 2 m above light without water (e.g., photocopiers or stainless steel).
Ni-Kovic operates an in-house factory in mainland China The thickness of the thickness of the thicken to the bath is strictly tested and the steel appliances can be ordered on-site scale.
Browse Stainless Steel Equipment →X. Electricity, gas, ventilation and inseparation
10.1 Power
- All equipment functionality is shown, and the total payload is used at the same time.
- Large-power heat equipment is generally 380V terrain, such as 18KW 炒炉 + 15KW Thom + 36KW tri gatesteam cabinet has reached 69KW.
- Electricity works are carried out by registered electrical engineering personnel in accordance with the Electricity (Travel) Code.
For further details Cinduction cooker security.
10.2 Gas
- All gas installations in the vault are performed by the registered gas engineering contractor.
- Oriental shall arrange security checks at least every 12 months and keep records of at least two years.
- The use of oil and gas in the lower floor of the ground is subject to restrictions.
10.3 Pumps and oil cigarettes
- Separate ventilation systems are in place in kitchens, toilets and seat rooms.
- Metal pyrotechnics (stainless steel pyrotechnics) are placed on the plating.
- EPA provides that ventilation shall not be visible or cause fodour disturbance; palm oil blows, fires, etc., shall be fitted with efficient air pollution control equipment.
- The empty roof is the same.
10.4 Exclusive oil
- Grounds are dumped at drainage canals.
- There should be no sand wells in the kitchen.
- The installation of segregated oil facilities is carried out on a regular basis.
- Steam cabinet, refrigerator (ventilation) are to be set aside for water.
xi. Establishment of kitchen equipment by cafeteria type
| Restaurant Type | 炒煮 | 蒸煮 | Refrigeration | Other |
|---|---|---|---|---|
| Hong Kong-style cafe, Hong Kong-style cafe | Terminal end induction wok cooker, four head of location | Three steam cabinet (cooking cooks), rice roll steamer | Stock refrigerator + refrigeratorator枱 | 扒炉, blows, tea and coffee urn,hot water urn |
| Alcohol, middle gardens | Multiple induction wok cooker (two-head tailings are searchable), electromagnetic turtles | dim sum steamer, two headrice roll steamer, three steam cabinet | refrigeration of multiple refrigeration + sea | chicken poacher, burnt |
| Caucus, building | Truck, Tong | dim sum steamer,rice roll steamer, 蒸罉 | Refrigerator + refrigerator | Cage swing frame |
| Fast-Food Restaurants and Canteens | Four helmets, combinations | Three more steam cabinets | refrigeration of large volume refrigeration | Breaking, maintenance of meals |
| Sistery, coffee shop | flat-top induction cooker, four head | Depending on needs | Cold refrigerator, Champion | 扒炉, burnt |
| Summer store | Electrical magnetic aluminium, veterinary | Single headrice roll steamer | refrigerator枱 | stainless steel star |
XII. One-stop kitchen engineering process
- On-site inspections : Quantity ratings, understanding of vegetables, feeding, electricity, gas, gas plating and drainage.
- Bloat design : Purchasing of bathrooms along a single line with the sub-district, in line with the licence requirements.
- Selection of equipment : appliances, cooks, refrigeration, electrical heat equipment, with a homogeneity of strength.
- Infrastructure coordination Coordinated with licensee, gas broker, ventilation and licensee.
- stainless steel orders : The domestic plant produces steel appliances in size.
- Installation testing Timely delivery, installation, pilot machines.
- Upon receipt and sale Use of training and maintenance support.
Timing instructions
- Pre-signature assessment to avoid pre-empting discoveries of inappropriateness
- Electricity increases or switches to three different electricity are made available to the electricity company as soon as possible
- Delivery of steel fixtures for production and transport time
- Applications for licence plates are synchronized with improvements and are under license plate conditions
- Pre-test completion of training with staff
Ni-Kovic understands timely delivery as the most basic and most important commitment to clients. Our Services and Projects.
XIII. List of common planning errors and general inspections
Common errors
- The signing of the contract was preceded by the finding that the leasehold use, the non-establishment of the building or the area of the food room were not in conformity with the contract.
- The bought of the equipment first found that the electricity was not enough or that there was no gas.
- refrigerator was shackled and electricity consumption was frustrating.
- Acquaintances cross and risks are high.
- The steam cabinet was not set aside for water pumping, and the drifting was drifted.
- At present, steel is immobile and leaves the sludge.
- It is not to control the use of oil cigarettes for the sake of inclination.
List of general inspections
- Licence, violation, area, floor, gas export
- licence plates: wall, ground, hand-washing, ventilation, disinfection, birth manager
- Line of movement: single-way, synchronized, grace
- Equipment: appliances, lithium, refrigeration, heat, water pumps
- Infrastructure: electricity, gas, ventilation, oil insulation, drainage
- Steel: size, height, 304 stainless steel
- Engineering: timetable, coordination, pilot, training, post-sale
Signing the Ni-Kovic ' s choice to do your baby engineering company?
On-Time Delivery
The most basic and most important commitments to clients.
Direct from Our Factory
Domestic self-contained plant, trade and integration.
Made to Measure
The lithium is fitted with the steel appliance.
Complete Project Solutions
After layout, selection, formulation, installation and sale.
Frequent problems in planning the cafeteria in Hong Kong cafeteria FAQ
The cafeteria planned the first step of the kitchen?
Pre-contracting assessment of baggage: leasing co-planned uses, intrusion, food room area, electricity, gas, drainage exports and drainage, followed by the design of kitchens on the basis of the vegetable sheet.
Is there a breeding requirement with the ground for the roof wall?
The wall is paved with light slippages that do not absorb water-friendly potable materials to no less than 2 m high, with the wall being internalized; ground defences, colours, water inhalation, dumping to drain water canals.
How many hand-washing houses are to be dressed?
At least one place in each food room, kitchen and laundry, the standard is one for every 20 employees, with a length of not less than 350 mm.
There is a demand for loot ventilation?
Separate ventilation systems are in place in the kitchens, toilets and seat rooms, with metal pyrotechnic fluorescent fluorescent fluorescent fluctuators installed; ventilation is not allowed to produce visible oil flue or to cause gas disturbances.
There can be no sand wells in the kitchen?
The EPA guidelines refer to the proposed kitchens, food distribution rooms and bathrooms that should not contain sand wells.
The provisional licence is valid for several patiences?
Six months; all basic issuance requirements may be received within one working day, with outstanding provisions to be completed.
The kitchen rolling line should be designed?
Single-direct process: Storage of receipts 粗 粗 crude processing 粗 粗 粗 粗 粗 粗 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐 餐
(b) Choice choice of gas?
Based on a bath, vegetable homogeneous power decision; most of the total power of the business space bank, vegetables can be piloted or hybrid in the fire.
stainless steelkitchen equipment is to be constructed?
Ni-Kovic can be searched for calibration by size, fencing, water and cooking heights.
Ni-Kovic can provide plumbing engineering services?
The design, process and ventilation gas improvement, the supply of chicken refrigerated cable equipment, stainless steelkitchen equipment, a one-stop commercial kitchen project, welcoming electricity 2155,2826 or WhatsApp 85293131881.
Related commercialkitchen equipment and kitchen equipment
:: The licence plates and derivatives are based on the Food and Agriculture Code of the Food and Agriculture Organization of the Food Environment and the guidelines for applications for loose licenses; public information from the Gas, Electricity, Fire and Environmental Protection Agency, the Fire Service and the Environmental Protection Agency, which is based on the latest laws, licensing conditions and professional opinions, is used for reference only.
Prior to opening, we were first incredible with us
Thanks to your emplacement, vegetable formula, meals and budget, Ni-Kovic could start with the burial design and complete the same-stop commercial kitchen works with you for equipment selection, stainless steel.
WhatsApp 85293131881 Contact Us